Production Scheduling Model in Aluminium Foundry (CROSBI ID 137303)
Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Matičević, Gordana ; Majdandžić, Niko ; Lovrić, Tadija
engleski
Production Scheduling Model in Aluminium Foundry
There are numerous methods and strategies for production management which are successfully implemented in the metal industry and in the automobile and machine tools industry in particular. However, little research has been published regarding scheduling foundry operations. Therefore, the main goal of this paper is to develop a new mathematical model for scheduling foundry operations based on the MRP II (Manufacturing Resource Planning), JIT (Just in Time) and OPT (Optimized Production Technology) concepts. The research strategy includes a review of available literature and integration of the developed mathematical model into a foundry for testing the model with real data. The proposed model is successfully implemented into the ERP (Enterprise Resource Planning) system of Aluminium Ltd. in Mostar. The conclusions offered in this paper are based on the results of the tests carried out in that single foundry so that further work is required to validate the findings at other foundries and other manufacturing areas.
aluminium production; scheduling; mathematical models; tardiness minimization
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano