Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Optimizing Time Utilization of FMS (CROSBI ID 149326)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Perinić, Mladen ; Mikac, Tonči ; Maričić, Sven Optimizing Time Utilization of FMS // Strojarstvo : časopis za teoriju i praksu u strojarstvu, 50 (2008), 6; 353-362

Podaci o odgovornosti

Perinić, Mladen ; Mikac, Tonči ; Maričić, Sven

engleski

Optimizing Time Utilization of FMS

The aim of the research is to solve the problem of simultaneous production on the flexible manufacturing system with different combination of product types and quantities that will give maximal utilization of production system. The presumption for good utilization of FMS is in forming of working order with such product type structure that will make possible of production processing with minimal time load of complete production system. Working order structure from the point of product types and quantities is dictated by market demands that are known earlier. Because the structure of particular working order is not harmonized with the exploitation characteristics of FMS, we are faced with problem how to realize working order in such conditions as well as how to achieve main goal: shorter machining cycle with less time occupation of production system. The method based on two phases for solving problem of control working order realization is presented in the work. In the first phase the selection of optimal combination of process plans which gives minimal time load of production system through simultaneous production of different products and their quantities is given. In the second phase the order of part production and the order of particular operations processing is optimized. The optimization problem in both phases of control is solved by application of genetic algorithm approach. The software for computing and optimizing of processing order on FMS is developed.

working order; time utilization optimization; genetic algorithm; simultaneous production

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

50 (6)

2008.

353-362

objavljeno

0562-1887

Povezanost rada

Strojarstvo

Indeksiranost