Construction time-cost model in Croatia (CROSBI ID 173043)

Prilog u časopisu | izvorni znanstveni rad | međunarodna recenzija

Car-Pušić, Diana ; Radujković, Mladen Construction time-cost model in Croatia // International journal for engineering modelling, 22 (2009), 1-4; 63-70

Podaci o odgovornosti

Car-Pušić, Diana ; Radujković, Mladen

engleski

Construction time-cost model in Croatia

The paper deals with the applicability of the «time-cost» model for calculating the sustainable construction time for building projects in Croatia. In this model the time is expressed as a function of money in the project, while the specific constants K and B need to be determined. These constants depend on economic characteristics of the country or a larger area and therefore had to be separately calculated for a region with similar economic characteristics. The modeling of the constants was performed for two groups of building projects – the roads and residential and office multi-storey buildings. The obtained results have been analyzed and compared to the corresponding results from abroad.

construction time ; „time-cost“ model ; constants K and B ; linear regression analysis ; building projects

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

22 (1-4)

2009.

63-70

objavljeno

1330-1365

Povezanost rada

Građevinarstvo

Poveznice
Indeksiranost